Crude Oil Washing Checklist:
Pre – Arrival Checklist:
Vessel Name:_________________ Port: Date:_______________
| 1. | Has the terminal been notified. | Y/N |
| 2. | Has the oxygen analysing equipment been tested and working satisfactorily. | Y/N |
| 3. | Is tank washing pipeline system isolated from the water heater and E/R system. | Y/N |
| 4. | Are all hydrant valves on the tank washing line blanked. | Y/N |
| 5. | Are all valves to fixed tank washing machines shut. | Y/N |
| 6. | Has the tank cleaning line been pressurized to the required maximum working pressure and leakages made good. | Y/N |
| 7. | Have drive units for tank washing machines been inspected. | Y/N |
| 8. | Have pressure gauges on the discharge line, manifold, and tank cleaning main been checked. | Y/N |
| 9. | Has communication system been checked and tested. | Y/N |
| 10. | Has the stripping system monitoring equipment been checked. | Y/N |
| 11. | Has the organisation plan been drawn up and posted with duties and responsibilities defined. | Y/N |
| 12. | Has the Discharge / COW operation plan been drawn up and posted. | Y/N |
| 13. | Has the terminals standard radio checklist, been completed and transmitted. | Y/ |
Crude Oil Washing Checklist
Before Crude Oil Washing Checklist
Vessel Name:_________________ Port: Date:_______________