How the alarm testing of SCBA (Self Contained Breathing Apparatus) is done?
Procedure for ALARM TESTING:
Open cylinder valve.
Line will be pressurized with 200 bar pressure.
Pressure gauge indicate 200 bar pressure.
Close cylinder valve.
Check pressure should not drop 10 bar in a minute.
Now to make alarm test, operate demand valve and pressure will start to reduce from high pressure line.
When on pressure gauge the pressure will reach around 55/60 bar the alarm will sound which indicates that now you have only 8-10 min to escape. This test is called alarm testing of SCBA set.
1 Comment
Why we can’t make an alarm test with positive pressure valve
Why we can’t make an alarm test with positive pressure valve