d) Are COW Line Pressure Gauges working
e) If Tank Cleaning Heater is effectively blanked or isolated
f) Is person in charge of COW operation certificated and experienced
|
|
57. |
SCB48 |
Are there instruments capable of measuring hydrocarbon content in O2 deficient atmosphere available and working. |
|
|
58. |
SMG12 |
Are Emergency Towing wires in good condition and properly rigged. (ISGOTT 3.7.2) |
|
|
59. |
SMG13 |
Are Bow Stoppers fitted. (OCIMF SPM 2.1) |
|
|
60. |
SMG14 |
Is Emergency Towing System fitted at the forecastle and on aft deck (tankers > 20000 dwt) |
|
|
61. |
SRD06 |
Are Main Transmitting Aerials earthed. (ISGOTT 4.11.2) |
|
|
62. |
SOM01 |
Is the fire wire rigged not more than 1 meter above sea level? |
|
|
63. |
SOM02 |
Is permission taken from head office prior to carrying out hot work in hazardous areas. |
|
|
64. |
SOM03 |
Are enclosed space entry procedures followed for entry into pumproom after ventilation has been stopped? |
|
|
65. |
SOM04 |
Are wires and ropes reeled properly on the winch drums? |
|
|
66. |
SOM05 |
Does the vessel have mixed mooring? |
|
|
67. |
SOM06 |
Is the breaking stress of mooring tails > 137% of the breaking stress of the wires. |
|
|
68. |
SOM07 |
Is the location of lighterage equipment well marked? |
|
|
69. |
SOM08 |
Is lighterage equipment available and maintained in its marked location? |
|
|
70. |
SOM09 |
Are the Walkie Talkies in use intrinsically safe? No. of W/T sets on board__________ |
|
|
71. |
SOM10 |
Have cargo and COW pipelines been pressure tested within last 12 months and is date and pressure prominently stenciled on the pipelines? Last done |
|
|
72. |
SOM11 |
Has the vessel been subject to unannounced D & A tests within last 12 months? Last done |
|
|
73. |
SOM12 |
Has the annual test for winch Brake Holding Capacity been done? Last done |
|
|
74. |
SOM13 |
Are means available to trip the COP from outside the pumproom? |
|
|