What is Cargo handling preparation for Car Carrier ?

Indication of deck number and deck height

The deck number and the height clearance of each deck (pontoon location number of each pontoon deck) should be indicated in a conspicuous place.

Height clearance to be indicated

Installation of liftable decks

Ships having liftable decks should have the decks installed after they have been adjusted to the heights of the vehicles.

Preparation of cargo-handling materials and the maintenance of cargo-handling equipment

Cargo handling materials such as lashing materials, dunnage, booster cables and wheel blocks should be prepared, In addition, cargo-handling equipment such as lift cars, moveable lamps, hydraulic devices, elevators, cranes and shore ramp lifting wire should be serviced. 

Preparation of cargo-handling materials and the maintenance of cargo-handling equipment

Cargo handling materials such as lashing materials, dunnage, booster cables and wheel blocks should be prepared. In addition, cargo-handling equipments such as lift cars, moveable lamps, hydraulic devices, elevators, cranes and shore ramp lifting wire should be serviced.