What are test carried out in Inert Gas System prior to Loading Operation ?

  • Oxygen monitoring equipment must be calibrated and alarm points checked, this includes both portable and fixed equipment.
  • Automatic shut-down systems and valves checked.
  • Deck seal alarms tested.
  • Non return valves should be checked.
  • Hydrocarbon gas detectors should be checked and alarms tested.

Points to pounder :

  • An inert gas maintenance record is to be maintained during all above checks and testing
  • When the IG plant is not in use the inert gas main master valve or deck isolating valve must be closed.
  • An inert gas operation log is to be maintained by the responsible officer during use of the IG plant.