Miscelleneous

What is ISM Code and its content?

  • Intermediate safety management audits should be carried out to maintain the validity of the Safety Management Certificates. The purpose of these audits is to verify the effective functioning of the safety management system and that any modifications made to the safety management system comply with the requirements of the ISM Code. In certain cases, particularly during the initial period of operation under the safety management system, the Administration may find it necessary to increase the frequency of the intermediate verification. Additionally, the nature of non-conformities may also provide a basis for increasing the frequency of intermediate verifications.
  • If only one intermediate verification is to be carried out, it should take place between the second and third anniversary dates of the issue of the Safety Management Certificate.
[contentcards url=”https://5gplans.co.in/2021/05/27/jio-5g-launch-date-plans-and-expected-internet-speed/”]
What is  Renewal verification of safety management certificate( SMC) as per ISM?

Renewal verifications are to be performed before the validity of the Document of Compliance or the Safety Management Certificate expires. The renewal verification will address all the elements of the safety management system and the activities to which the requirements of the ISM Code apply. Renewal verification may be carried out from six months before the date of expiry of the Document of Compliance or the Safety Management Certificate, and should be completed before their date of expiry.

About the author

Amit Sharma

Graduated from M.E.R.I. Mumbai (Mumbai University), After a brief sailing founded this website with the idea to bring the maritime education online which must be free and available for all at all times and to find basic solutions that are of extreme importance to a seafarer by our innovative ideas.