What are procedure to be followed prior to working outboard on ships ?

  Securing points for safety lines, gantlines, blocks  of adequate strength, no sharp edges       18 Work in the vicinity of Propeller, then immobilised, Chief Engineer informed.       19 Any other permits involved with this job ? Please specify?   20 Additional Precautions to be taken : ( please specify)   SECTION 2 :  AUTHORISATION   I am satisfied that all appropriate safety  measures are in place and that the work can be conducted safely. Name, Rank and Signature of Responsible Person   Work Authorised By: Master              

 

SECTION 3 : PERMIT CLOSURE/CANCELLATION
Equipment /system has been de-isolated and returned to the “in-service condition”  
All notices and tags removed  
The work area and equipment is in a safe condition  
 Work Completed   Permit is time Expired   Work suspended  
Permit Closed By Responsible Person : Signature :

Date :

Time: