What are PMS carried out on Anchor ?

  • Carry out survey as per classification society rules and guide.
  • Anchor chain diameter measurements are taken and should be within limits and marking done at dry-dock ,
  • Swivel clearance and gypsy condition checked on windlass.
  • Chain locker bitter end checked from inside
  • Chain locker thickness measurement taken and eductor system tried out for bilges.
  • Once 2.5 yearly all mud is cleaned from chain locker .
  • General maintenance of chain , blasted and painted with markings.