Miscelleneous

Checklist for Safety Construction Survey as per IRS class or Indian Register of Shipping ?

2 An approved firm has carried out thickness measurements and all results found satisfactory. TM reports to be submitted to HO and a copy to be placed on board 3 All essential machinery has been opened up and surveyed as required and all essential shipboard engineering systems found in satisfactory condition. 4 For ships subject to Enhanced Survey procedures (tankers, bulk carriers), full requirements of ESP have been complied with, as applicable.

 

F
FIRST SURVEY BY INTERNATIONAL REGISTER OF SHIPPING
1 Have copies of previous safety construction certificate been forwarded to HO along with survey reports? (Where previous certificate is not available, HO permission must be obtained before issue of interim certificates)  

About the author

Manish Mayank

Graduated from M.E.R.I. (Mumbai). A cool, calm, composed and the brain behind the development of the database. The strong will to contribute in maritime education and to present it in completely different and innovative way is his source of inspiration.

Leave a Comment