CHECKLIST |
Done |
Req’d by office |
*RA |
*WR |
*D/E |
1 |
Sound alarm |
|
X |
|
|
2 |
Inform bridge of situation |
|
|
|
X |
3 |
Start and parallel stand by generator |
|
|
|
|
4 |
Start one or a combination of the following pumps on direct bilge suction to overboard:-
- Fire/Bilge & Ballast pump
- Fire & Bilge pump
- Main cooling SW pump on main bilge injection. (Put temperature controller setpoint to zero and close sea suction valve)
|
|
|
|
|
5 |
If leakage is from a pipe, isolate, but with due consideration to the effect on the plant and the navigational situation. |
|
|
|
|
|
|
|
|
|
|