Checklist after completion of loading or discharging on bulk carrier ?

Ships Name:

Date:
Port:  
  LOADING / DISCHARGE COMPLETION CHECK LIST
1.   RESPONSIBILITY – CHIEF OFFICER  
2.   All mechanical damage repaired or signed for.  
3.   Draught survey completed.  
4.   All bilge cover plates in position (Log book entry.)  
5.   All trackways swept and free of cargo.  
6.   All hatch lids closed and secure.  
7.   Vessel ballasted and secured for sea passage.  
8.   All ballast tank lids secure, tanks 100% full of ballast.  
9.   Ballast system shut down and all pumps stopped.  
10.         Navigating Bridge prepared, dust covers removed from equipment.  
11.         LSA/FFA equipment (if applicable)re-stowed in normal positions  
12.         Mooring machinery and moorings cleared of any cargo residues.  
13.       
14.          
15.      