VESSEL: PLACE: DATE: TIME: ...
Latest Stories
Checklist for ship to ship transfer or STS operation.
SHIP TO SHIP TRANSFER CHECK LIST 1 – PRE-FIXTURE INFORMATION (FOR EACH SHIP) (BETWEEN...
What are precautions while loading and carrying cement on ships?
The main problems with cement cargo arise when holds are not initially dry, clean and watertight...
What is Autopilot, its principle and details?
An autopilot (or pilot) is a mechanical, electrical or hydraulic system which can maintain a vessel...
Motor Engineering – MEO CLASS 4 MMD PAPER
Which standards govern the specifications for supply of Residual Marine Fuels and Distillate Marine...
What is survey report of BC code ?
Part A Name of ship Signal letters Port of registry Gross tonnage Date keel laid IMO number First...
What all clearances need to be checked during the main engine...
Valve seat and valve spindle are grind at different angle so that we can get the perfect sealing...
Checklist for Annual and Intermediate Surveys of ships
General (Annual and Intermediate Surveys) Confirm no modifications have been made to the ship or...
What are unwanted echoes and signals appear on Radar screen?
The navigator must be able to recognize various abnormal echoes and effects on the radarscope so as...