CHAPTER 8: DOUBLE HULL OPERATIONS
8.1 Stability Considerations
8.2 Routine Monitoring Of Double Hull Spaces
8.3 Tank Entry Procedures For Double Hull Spaces
8.4 Ventilation Procedures
8.5 Action To Be Taken In The Event Of Cargo Leakage
8.6 Inerting Double Hull Spaces
8.7 Gas Freeing And Tank Entry After Inerting
8.8 Tank Cleaning
8.9 Handling Ballast After A Leak
CHAPTER 9: TANK CLEANING AND GAS FREEING
9.1 Supervision And Preparations
9.2 Cargo Tank Washing And Cleaning
9.3 Gas Freeing
9.4 Crude Oil Washing
9.5 Special Tank Cleaning Procedures