QWH13
QWH14
QWH15
QWH16
Are foll. logs maintained;
a) Master Night Order book (SQP 16.5)
b) Radar logs(SQP 16.5)
c) Compass error log(SQP 16.5)
d) Bridge movement book(SQP 16.5)
e) GMDSS log(SQP 9.3.3.1) |
|
|
| 41. |
QWH17 |
Are navigational warning and weather reports filed for reference.(SNP 9.3) |
|
|
| 42. |
QWH18 |
Is the Ship’s Technical Library maintained. (SQP 2.2) |
|
|
| 43. |
QWH19 |
Are watch schedules prominently posted for Watchkeepers (Form D-55, SQP 9.27) |
|
|
| 44. |
QCO01 |
Are Cargo gear registers up-to-date.(BCP 2.3) |
|
|
| 45. |
QCO02 |
Are record of cargo wires in use along with their test certificates available.(SQP 10.2.1) |
|
|
| 46. |
QCO03 |
Do all spare new wires and ropes bear tags giving reference of the test certificate.(SQP 12.2.2) |
|
|
| 47. |
QCO04 |
Are all old and condemned wires and ropes identified and tagged to prevent their usage.(SQP12.2.3) |
|
|
| 48. |
QCO05 |
Is the Loadicator functional and check sheets/printouts available for each stowage.(BCP 3.3, SQP 1.5.1, TCP 3.1) |
|
|
| 49. |
QCO06 |
Are documents available evidencing cargo planning (BCP 3.5, TCP) |
|
|
| 50. |
QCO07 |
Are stowage plans, cargo papers documented. (BCP 3.5, TCP) |
|
|
| 51. |
QCO08 |
Are loading/discharging plans with hold/tank wise sequence of operation documented and known to all. (BCP 3.5, 3.6, TCP) |
|
|
| 52. |
QCO09 |
Are certificates of inspection by surveyors/terminal representative prior to loading/discharge available.(BCP 6, TCP 1.8) |
|
|
| S.No |
Code |
Item |
Y |
N |
| 53. |
QCO10
|
Leave a Comment