Checklist for quality and safety management audit on ships ?

Are sufficient fully charged spare Air Bottles available.

Does the ship have Recharging Compressor.

Are Officers and Crew familiar with donning and use of breathing apparatus. 54. SFF11

SFF12 Is Ship-Shore Fire Connection readily available (SOLAS II-2/19).

Is the location clearly marked.   55. SFF13 Is the paint locker fitted with a fixed fire smothering system.

State smothering medium.  56. SFF14 Are Fire Alarms tested regularly (SOLAS II-2/13). 57. SFF15

SFF16 Are all vent flaps and Funnel Dampers marked ‘OPEN/SHUT’.

Are they free to operate (SOLAS II-2/16.9, 2/48). S.No Code Item Y N 58. SFF17