Ships Name: | Date: | ||
Port | |||
PRE-LOADING / PRE-DISCHARGE CHECK LIST | |||
RESPONSIBILITY – CHIEF OFFICER | |||
1. | Draught survey complete. | ||
2. | Ship/Shore Safety checklist completed with stevedore /terminal representative. | ||
3. | Loading and deballasting plan with Duty Officer & posted in Cargo office | ||
4. | All hatch covers open and secured. | ||
5. | All guardrails in place. | ||
6. | All ballast tank, void space and hold access lids shut. | ||
7. | All fire fighting equipment and safety equipment (specified in the code) in readiness. | ||
8. | No smoking, notices displayed. | ||
9. | All ballast tank ventilators in the “OPEN” position. | ||
10. | Engine room given notice for use of ballast pumps. | ||
11. | Mechanical ventilation to machinery spaces shut down (if required). | ||
12. | All bilges covered and plates secure and same recorded. | ||
13. | Personnel and tools in readiness to change over “Wet holds” after deballast. | ||
14. | Outside equipment provided with dust covers. (eg. Bridge repeaters / projectors/ Lifeboat / Liferafts etc.) | ||
15. | Air conditioning system put on “Recirculation”. | ||
16. | Deck Watchman on duty to tend gangway and moorings. | ||
17. | |||
18. |
Name………………………………………………………………. Signature……………………………………………….. .
Note:
Watch keeping officers and crew informed of the hazards involved in the particular cargo to be loaded and that they are familiar with the precautions to be taken.