Checklist for MARPOL 73/78 Annex 1survey ?

Part Flow

EE.11 Is the part flow system (if fitted) as described in the ODME Manual and examined for obvious defects?

EE.11.1 Was the communication system between the observation and discharge control positions tested?

EE.11.2 Was a functional test carried out including the sampling probe(s), sample water piping system, sample feed pump(s), display arrangement, sample discharge arrangement and where fitted flushing arrangements?

Other

EE.12 For tankers with special ballast arrangements are there approved operational procedures on board and are the arrangements satisfactory?

Part 3 – Initial Surveys

  • Initial Survey Plan Approval

All Ship Types

FF.1 Have the following plans/calculations been examined and approved?

FF 1.1 Installation of the oily-water filtering equipment, 15ppm alarm system and automatic stop device (Reg 15)

FF 1.2 Segregation of fuel/lub oil and ballast systems and location of fuel oil tanks (Reg 14)

FF.1.3 Sludge tank capacity (Reg 17)

FF.1.4 Discharge piping arrangements including standard discharge pipe (Reg 17)

FF.1.5 Shipboard Oil Pollution Emergency Plan or Shipboard Marine Pollution Emergency Plan