EE Survey of the Condition of the Ship and its Equipment Tankers Pumping and Piping
EE.1 Is the arrangement of slop tanks and associated piping systems satisfactory?
EE.2 Are the piping systems for discharge of dirty ballast water or oil contaminated water satisfactory?
EE.3 Is the means of communication between the overboard observation point and cargo control station operational?
Oil Water Interface Detector
EE.4 Is the oil/water interface detector(s) in satisfactory condition and operating correctly? *
Double Hull
EE.5 Are the arrangements for compliance with regulation 13F as approved and satisfactory?
EE.6 Are the arrangements for compliance with regulation 13G as approved and satisfactory?
EE.6.1 Is the phase out date correctly stated on the FORM B Oil Discharge Monitoring and Control System (see note 1)
EE.7 Was the system examined for obvious defects, deterioration or damage and absence of leaks?
EE.7.1 Was the operation of the system confirmed including the oil content meter by ensuring the operation of:-
EE.7.2 Automatic and/or manual means to stop the discharge overboard, starting interlock, manual override control
EE.7.3 Audible and visual alarms, system reset to normal after alarm condition EE.7.4 Recording device and confirm there are adequate consumables for the recording device
EE.7.5 Pumps, valves, flow meters, flushing arrangements, and sampling probes
EE.7.6 Was it confirmed from onboard records that the meter has been calibrated in accordance with the manufacturers instructions?