Ships Name: |
Date: | ||
| Port: | |||
| LOADING / DISCHARGE COMPLETION CHECK LIST | |||
| 1. | RESPONSIBILITY – CHIEF OFFICER | ||
| 2. | All mechanical damage repaired or signed for. | ||
| 3. | Draught survey completed. | ||
| 4. | All bilge cover plates in position (Log book entry.) | ||
| 5. | All trackways swept and free of cargo. | ||
| 6. | All hatch lids closed and secure. | ||
| 7. | Vessel ballasted and secured for sea passage. | ||
| 8. | All ballast tank lids secure, tanks 100% full of ballast. | ||
| 9. | Ballast system shut down and all pumps stopped. | ||
| 10. | Navigating Bridge prepared, dust covers removed from equipment. | ||
| 11. | LSA/FFA equipment (if applicable)re-stowed in normal positions | ||
| 12. | Mooring machinery and moorings cleared of any cargo residues. | ||
| 13. | |||
| 14. | |||
| 15. |
|
||

Leave a Comment