- When level is lowered by 1.5m the water level = 5.5m above. It means stern has already taken to the block while forward end is still afloat.
Change in draft aft = (5.5 – 6.20)m = 0.70m
70 = P/17 +( P⨯70/150) ⨯70/144
P = 245.03 tonnes
GG1 = P ⨯ KM/W
= 245.03 ⨯ 6.9/6220
= 0.272m
Virtual GM = (Old GM – GG1)
= (0.7 – 0.272)m
= 0.428m
- When level is further lowered by 1.0m water level = 4.5m. Since water level is lower than hydrostatic draft ship has taken over block overall.
Then P = (TPC ⨯ mean rise)
= 0.679 ⨯ 100 ⨯ 17
P = 1154.3 tonnes.
GG1 = (P⨯KM)/W
= ( 1154.3 ⨯ 6.9 )/ 6220
= 1.280m