4 BALLAST WATER EXCHANGE PLANS
4.1 Ballast Water Exchange starting from the Heavy Ballast Condition
4.2 Ballast Water Exchange starting from the Light Ballast Condition
5 APPENDIX A – IMO RES. A868(20)
6 APPENDIX B: BLANK FORMS
7 APPENDIX C: EXISTING NATIONAL OR LOCAL QUARANTINE REQUIREMENTS FOR BALLAST WATER MANAGEMENT
8 APPENDIX D: CALCULATIONS FOR EACH STEP IN THE BALLAST WATER EXCHANGE PLANS
Leave a Comment