Therefore, New Virtual GM = (0.7 – 1.280)m
= -0.580m
-
A vessel is to be dry docked in a damaged condition. She is floating at F 12.60m and A 9.00m. it is estimated that she will take the blocks 15m aft of the forward perpendicular. Estimated data: KG 8.9m, KM 9.4m, TPC 21.3 t/cm, MCTC 290 tm/cm, AF 76m, LBP 165m displacement 19500 tonnes.
-
Is it safe to dry dock the vessel in this condition? Support your answer with calculation.
-
Estimate the drafts at the perpendiculars on taking to the blocks fore and aft.
Solution –
- Trim = 3.60m, d = 74m
P = (trim ⨯ MCTC)/d
= (360 ⨯ 290)/74
= 1410.8 tonnes
GG1 = (P ⨯ KM)/W
= (1410.8 ⨯ 9.4)/19500
= 0.680m
Old GM = 0.5m,
GG1 = 0.680m